I've been daily working on the basement still, and continuing to guitar daily, also haikuing. Here's what I've been up to from March 1-10, 2026
Basement Project
I work 5 of the 10 days. This is all "last phase" of the mudding and sanding. I start with making a listed schedule of last things to do -- vertical panel seams, corner seams, problem area at staircase and at covered pipes, ceiling seams, remake the N window sill; Then I spend a day on E and N vertical surfaces, and additional layers on problem areas; Another day is all ceiling surfaces; there's at least 2 rounds of the last phase. I shine a light perpendicular to the seam to see imperfections. I'm going around the basement with a ladder, a drywall sanding sponge, and a metal container of compound thinned with water.